10-29-2016 Posted on October 29, 2016November 5, 2016 by TheBigBusTheory First coat of solar RV paint We installed a powered vent in the bedroom. Second coat of paint We drilled the hole for the shower drain.
10-12-2016 Posted on October 12, 2016November 5, 2016 by TheBigBusTheory The bedroom is more organized now. Cut out some drain holes for plumbing. Our floor goes laminate (or vinyl) flooring, then plywood, then 1.5″ of styrofoam, then rubber, more plywood, and finally the bus metal floor. The sink and toilet are installed in the final locations. Installed bathroom flooring.