08-25-2016

img_20160825_181321593
We installed two sets of shelves.  One next to the rear door, and one over the kitchen.

img_20160825_181355638img_20160825_181310016

img_20160822_204058090
We are installing an RV window next to the front door.
img_20160825_181250382
We are reinforcing the mezzanine roof with 2×4’s in preparation for winter snow.  The new wood slats are much stronger.  We are also adding more foam insulation.