04-16-2016

IMG_20160416_105623515
We took down the upper front wall in preparation for the upper loft build.
IMG_20160416_234234463
The curved supports were cut out of HDF counter tops.

IMG_20160416_210825522

IMG_20160416_234207254
Sitting on the ‘Mezzanine”

3 thoughts on “04-16-2016

    1. We have given comical names to the different sections of the bus. The undercarriage storage bays have become ‘the basement’. We are building the bedroom at the rear of the bus on top of the preexisting bus roof. The bedroom roof will extend vertically about 5 or 6 ft which we call ‘upstairs’. (While driving, the bedroom roof is down, we will only extend it when parked). We call the loft above the driver’s seat ‘the mezzanine’ because it is higher than the main floor, but lower than the extended bedroom height.

      Like

  1. fantastic pics GREAT JOB A far cry from rebuilding a Mazda ? car engine ….no?
    we have some fond memories of those days.
    You always were a good worker…. and it looks like you got a mate that’s a MATCH!!!!
    Luv you Lexie

    Like

Leave a comment